Inglewood - Crenshaw Boulevard

  • Test Location: On Crenshaw and 104th Street
  • Projected Start Date: August 10, 2015
  • Test Date: TBD
  • Projected End Date: October 2015
  • Traffic Control Measures: Crews are scheduled to work Monday through Friday, 9 a.m. to 3 p.m. Traffic on Crenshaw Boulevard will be reduced to one lane in each direction between 102nd and 104th Streets. The southbound left turn lane on Crenshaw Boulevard at 102nd Street will be closed for the duration of the project.