Thousand Oaks: Camino De Celeste

  • East End-Point Location, Nearest Cross-Streets: East of the end of Camino De Celeste
  • West End-Point Location, Nearest Cross-Streets: About 1,000 feet south of the 118000 block of Santa Rosa Road
  • Projected Start Date: 4/14/2015
  • Test Date: 5/12/2015
  • Test Results: No Leaks Detected
  • Projected End Date: 6/19/2015
  • Community Impacts: People passing by the test sites may see an excavated section of pipeline with test equipment installed and large water tanks staged nearby, as well as trucks and other vehicles. The local community may also notice truck traffic bringing the test equipment and water tanks to the test sites and then removing them.