Arroyo Grande - Alpine Street - Active - Replacement

  • Work Location:  Near the intersection of Branch Street and Rodeo Drive, Faeh Ave, North and South Alpine Street, Cerro Vista Circle, Fair Oaks Ave, and Valley Road.
  • Work Hours: Monday – Friday; 7:00 AM to 5:00 PM
  • Project Start Date: October 2017
  • Projected End DateApril 2018
  • Traffic Control Measures:  ​While each section is being worked on, traffic will be reduced to one lane in and around the construction area. Lane reductions will be in effect during work hours only, Monday through Friday from 7 a.m. to 5 p.m. and will be marked with traffic cones and signs.
  • What to expect:  The pipeline replacement work involves installing new pipeline parallel to the path of the existing pipeline. Next, the existing pipeline is taken out of service and all natural gas is safely removed from it. The new pipeline section is then connected to the distribution system and brought into service.
  • Construction Update:  Construction activities will continue the week of December 4, 2017 on Alpine Street between Cerro Vista Lane and Woodland Drive. Construction crews will be performing a Horizontal Direction Drill (HDD) and cleaning up the work area near the intersection of Alpine Street and Grand Ave. Please watch for detours and reduced speed signs near large construction equipment. Traffic control measures will be in place like lane reductions marked with traffic cones and signs during working hours.