Paso Robles - Vine Street - Active - Pipeline Replacement

  • Work Location: South of Firestone Brewery along Ramada Drive and continuing north along S. Vine Street
  • Work Hours: Monday - Friday; 7:00 AM to 5:30 PM.
  • Project Start Date: August 2017
  • Projected End DateNovember 2017
  • Traffic Control Measures: Ramada Drive will be closed for a short duration of the project. Traffic along Vine Street will be reduced to one lane during approved work hours, flagmen and traffic control signs will assist with the flow of traffic.
  • What to expect: The pipeline replacement work involves installing new pipeline parallel to the path of the existing pipeline. Next, the existing pipeline is taken out of service and all natural gas is safely removed from it. The new pipeline section is then connected to the distribution system and brought into service.