Current Activities
Dates provided are estimates, weather and other factors affecting safe working conditions could change the schedules. The public may see trucks and heavy equipment from SoCalGas and our contractors around the general construction areas.
Riverside County - West of the intersection of the I-10 Freeway and Haugen-Lehmann Way in Whitewater and ending just east of the intersection of North Hathaway St. & Morongo Rd. in Banning.
Pipeline Testing 3/13/2023 – 9/2023
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: There will be a temporary road crossing and ramp along Rushmore Ave and at the intersection of Morongo Rd. and N. Hathaway St.
Hesperia - On Silverwood St. between Foley Rd. and Perch Place
Hydrotesting 2/27/2023 – 5/2023
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: No traffic control is required.
San Juan Capistrano - in parking lot adjacent to Dr. Cortese Dog Park.
2/13/2023 – 4/2023
Work hours: Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: No traffic control is required.
Dana Point - along Sycamore Creek Trail and adjacent to San Juan Creek Trail.
2/13/2023 – 4/2023
Work hours: Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: Portion of Sycamore Creek Trail will be unavailable to the public. Temporary pedestrian access route will be available.
Rosedale - Near the intersection of Reina Rd. and Santa Fe Way.
Valve Automation 2/14/2023 – 4/2023
Work hours: Monday – Thursday from 7 a.m. to 5 p.m.
Community impacts: Temporary closure of the eastbound lane at the intersection of Reina Rd. and Santa Fe Way during work hours.
Indio - Near Monroe St., north of Eastside Dr.
Valve Automation 6/2023-9/2023
Work hours: Monday – Thursday from 6 a.m. to 4:30 p.m.
Wasco - On Lerdo Hwy. in between Central Ave and Wildwood Rd. and Wildwood Rd in between Lerdo Hwy. and Jackson Ave.
2/6/2023 – 9/2023
Work hours: Monday – Saturday from 7 a.m. to 4 p.m.
Community impacts: All the work will take place on the shoulder of the road.
Santa Barbara County – Santa Claus Lane starting at Padaro Lane and concluding near the junction of Spindrift Lane.
2/6/2023 – 4/2023
Work hours: Monday – Friday, 7 a.m. to 5 p.m.
Community impacts: Traffic control signage, flag personnel, and no parking signage will be posted along the construction route. Lane closures will be in effect for both the westbound and eastbound lanes along Santa Claus Lane.
Somis - on private property and public right-of-way near the intersection of Bradley Rd. and E. Los Angeles Ave
1/9/2023 – 3/2023
Work hours: Monday – Friday from 9 p.m. to 5 a.m.
Community impacts: A lane closure will be in effect along the eastbound lane of E. Los Angeles Ave. between Groves Pl. and North St.
Glendale - On Glenoaks Blvd. in between Highland Ave. and Concord St.
Valve Automation 4/3/2023 – 6/2/23
Work hours: Monday – Thursday from 7 a.m. to 4 p.m.
Community impacts: Intermittent lane closures in both directions on Glenoaks Blvd. in between Highland Ave. and Concord St.
Placentia - with in the Woodfield HOA community on Blueridge Dr and Chinook Dr.
11/282022 – 4/2023
Work hours: Monday – Friday from 7:30 a.m. to 5 p.m.
Community impacts: No parking and lane reductions will be in effect near work areas.
Alhambra - W Mission Rd and S Marengo Ave
4/17/23 - 08/16/23
Work hours: Monday through Friday 7:00 a.m. - 3:30 p.m.
Community Impacts: None the work is taking place within a SoCalGas Station
Los Angeles – on St Louis St in between Judson St and City View Ave
3/10/2023 – 6/16/23
Work hours: Monday through Friday, 7:00 a.m. – 5:00 p.m. (weekend work may be required)
Community impacts: There will be lane closures and reductions, parking restrictions, and driveway closures.
Los Angeles - on Sichel St. in between Main St. and Darwin Ave.
Hydrotesting 2/21/2023 – 4/20/23
Work hours: Monday – Friday from 7 a.m. to 5 p.m. (weekend work will also be required)
Community impacts:Sichel St will be closed in between Main St and Darwin Ave. There will be restrictions on street parking around the construction area. Residents who live on this section of Sichel St will be allowed to leave and enter.
Los Angeles - Pipeline for new CNG/LNG station on Arroyo St in between Dronfield St and the cul-de-sac ending at a UPS facility.
1/9/2023 – 6/2023
Work hours: Monday – Thursday from 7 p.m. to 4 a.m.
Community impacts: Arroyo St will be reduced to one lane in both directions and there will be ‘no parking’ signs posted around the construction area.
Los Angeles - on Marengo Ave. in between Mission Rd. and Chicago St., on Sichel St. in between Main St. and Darwin Ave. and on N. St. Louis St. in between City View Ave. and Judson St.
2/27/2023 – 6/9/23
Work hours: Monday – Friday from 9 a.m. to 3:30 p.m. (extended hours have been requested from the city)
Community impacts: There will be lane closures and reductions, parking restrictions, and driveway closures.
West Los Angeles – at Sepulveda Blvd and Constitution Ave, in front of the Los Angeles National Cemetery
Actuator and vault installation 9/26/2022 – 4/2023 Work hours: Monday – Friday from 9 p.m. to 6 a.m. Community impacts: Northbound traffic on Sepulveda Blvd will be reduced to one lane near the construction site during work hours.Newbury Park – along Cottonwood Ct. west of the American Oaks Ave. and Cottonwood Ct. intersection
Pipeline replacement 10/2022 – 11/2022
Work hours: Monday – Friday from 8 a.m. to 3:30 p.m.
Community impacts: A lane closure will be in effect along west Cottonwood Ct during work hours. Traffic control signage, lane closures, flag personnel, and no parking signage will be posted along the construction route.
Goleta - near the eastbound on-ramp from Sandspit Rd. to HWY 217
9/1/2022 – 12/2022
Work hours: Monday – Friday from 6:30 a.m. to 5 p.m.
Community impacts: the bike lane that runs alongside the eastbound Hwy 217 will be periodically closed during construction. Cyclists' advisories, traffic control signage, lane closures, no parking, and construction detours will be posted along the construction route.
Montecito - east of the Santa Isabel Ln. and N. Jameson Ln. intersection
On HOLD
Work hours: Monday – Friday from 8 a.m. to 4 p.m.
Community impacts: A lane closure will be in effect along the eastbound lane of N. Jameson Ln. during the project's work hours.
Yorba Linda - at the corner of Valley View Cir and Lavender Dr.
9/19/2022 – 1/2023
Work hours: Monday – Thursday from 7 a.m. to 5 p.m.
Community impacts: Traffic control will be set up at the intersection of Valley View Cir and Lavender Dr.
Morro Bay - on private property near HWY 41 in the City of Morro Bay
Pipeline Testing 9/2022 – 11/2022
Work hours: Monday – Friday from 6:30 a.m. to 6 p.m.
Community impacts: There are no traffic impacts.
Ventura – along E. Main St. and along Telephone Rd.
Pipeline Testing 1/3/2023 – 5/2023
Work hours: Monday to Friday from 9 p.m. to 5 a.m.
Community impacts: Lane closures will be in affect along E. Main St. between Callens Rd. and Donlon St. and along Telephone Rd. between E. Main St. and Portola Rd.
Ventura – on private property near the intersection of N. Olive St and W. McFarlane Dr.
Pipeline Testing 10/31/2022 – 11/2022
Work hours: Monday to Friday from 7 a.m. to 5 p.m.
Community impacts: Residents and businesses in the area may see additional truck traffic, a flat-bed truck, a large crane, and personnel on-site during this scheduled work period. All company vehicles will be parked within our property. Public parking will remain open for all residents and businesses. Those in the immediate area may hear some construction noise from the equipment and crews during work hours.
Ventura County / Carpentaria – near Taylor Ranch Rd. in Ventura County and continue west towards Casitas Pass Rd. in Carpinteria.
Pipeline Testing 10/10/2022 – 11/2022
Work hours: Monday to Thursday, 6 a.m. to 5 p.m.
Community impacts: Traffic control signage, flag personnel, no parking signage, lane closures, and detours will be posted along the construction route, if needed.
Simi Valley - Royal Ave and Darrah Ave.
Pipeline replacements, Hydrotest 8/15/2022 – 11/2022
Work hours: Monday – Friday from 9 a.m. to 3 p.m.
Community impacts: Lane closure will be in effect along westbound lanes of Royal Ave. Traffic control signage, lane closures and flag personnel and no parking signage will be posted.