Construction Activities by City

Locate the pipeline safety enhancement projects in your area.

Current Activities

Dates provided are estimates, weather and other factors affecting safe working conditions could change the schedules. The public may see trucks and heavy equipment from SoCalGas and our contractors around the general construction areas.

Chino Hills State Park - Along Telegraph Canyon Road, Bane Canyon Road, Powerline Trail, Drill Hole Trail, 3M Trail, and Corral Trail  9/6/2022 – 1/2023
Work hours: Monday – Friday from 6 a.m. to 6 p.m.
Community impacts:  Trails around construction will be intermittently for the duration of the project.

San Bernardino and Los Angeles County - between Adelanto and Littlerock
Hydrotest 8/1/2022 – 11/2022
Work hours: Monday – Saturday from 6 a.m. to 4:30 p.m.
Community impacts: No traffic impacts anticipated.

Westwood - Sepulveda Blvd. at Constitution Ave.
11/1/2022 – 3/2023
Work hours: Monday – Thursday from 8 p.m. to 6 a.m.
Community impacts: Traffic along Sepulveda Blvd will be reduced to one lane in each direction in the area surrounding our work zone. Left turns onto Constitution Ave from Sepulveda Blvd will not be permitted. Traffic restrictions will be in effect during approved work hours only. 

Glendale - at the intersection of Glenoaks Blvd. and Estelle Ave. 
Valve Automation 11/2022 – 2/2023
Work hours: Monday – Thursday from 7 a.m. to 4 p.m.
Community impacts: The crew will restripe lanes and close the inner two lanes in both directions on Glenoaks Blvd. K-rails will also be utilized.  A phased traffic control plan will be utilized to close off portions of Glenoaks Blvd and Estelle Ave.  

Carson -  at the intersection of Glenoaks Blvd. and Estelle Ave. 
11/1/2022 – 1/2023
Work hours: Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: Construction will take place on Sepulveda Blvd, west of Marathon Way. Westbound traffic along Sepulveda Blvd., near Marathon Way, will be reduced to one lane in the area immediately surrounding the work zone. Lane closures will be in place during approved work hours only. 

Placentia - with in the Woodfield HOA community on Blueridge Dr and Chinook Dr.
11/282022 – 4/2023
Work hours: Monday – Friday from 7:30 a.m. to 5 p.m.
Community impacts: No parking and lane reductions will be in effect near work areas.

Wilmington - F St. and Broad Ave. and D St. between Quay Ave. and Lakme Ave.
10/3/2022 – 11/2022
Work hours: Monday – Friday from 9 a.m. to 3:30 p.m.
Community impacts: There will be temporary no parking signs posted near our work area. Traffic on Broad Ave will be reduced to one line near the F St intersection.

Visalia - Hanford at various locations along Hwy 198 for the first phase of the survey and multiple streets in the city of Visalia for the second phase of the survey. 
10/3/2022 – 12/2022
Work hours: Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: A walking survey with a rolling barricade along with traffic control.

Los Angeles - on Marengo Ave. in between Mission Rd. and Chicago St., on Sichel St. in between Main St. and Darwin Ave. and on N. St. Louis St. in between City View Ave. and Judson St.
10/3/2022 – 12/2022
Work hours: Monday – Friday from 9 a.m. to 3:30 p.m. (extended hours have been requested from the city)
Community impacts: There will be lane closures and reductions, parking restrictions, and driveway closures.

West Los Angeles – at Sepulveda Blvd and Constitution Ave, in front of the Los Angeles National Cemetery
Actuator and vault installation 9/26/2022 – 12/2022
Work hours: Monday – Friday from 9 p.m. to 6 a.m.
Community impacts: Northbound traffic on Sepulveda Blvd will be reduced to one lane near the construction site during work hours.

Newbury Park – along Cottonwood Ct. west of the American Oaks Ave. and Cottonwood Ct. intersection
Pipeline replacement 10/2022 – 11/2022
Work hours: Monday – Friday from 8 a.m. to 3:30 p.m.
Community impacts: A lane closure will be in effect along west Cottonwood Ct during work hours. Traffic control signage, lane closures, flag personnel, and no parking signage will be posted along the construction route.

Lakewood – on Greenmeadow Rd. in between Faust Ave. and Carfax Ave.
Pipeline replacement 10/10/2022 – 1/2023
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: There will be lane closures and reductions, parking restrictions, and driveway closures.

Diamond Bar– Diamond Bar SoCalGas station.
10/10/2022 – 12/2022
Work hours: Monday – Friday from 6 a.m. to 5 p.m.
Community impacts: No community impacts

San Bernardino - Mill St. and Macy St.
9/19/2022 – 1/2023
Work hours: Monday – Thursday from 7 a.m. to 5 p.m.
Community impacts: There will be traffic control along Mill St. and Macy St. with temporary no parking signs and sidewalk closures.

Goleta - near the eastbound on-ramp from Sandspit Rd. to HWY 217
9/1/2022 – 12/2022
Work hours: Monday – Friday from 6:30 a.m. to 5 p.m.
Community impacts: the bike lane that runs alongside the eastbound Hwy 217 will be periodically closed during construction. Cyclists' advisories, traffic control signage, lane closures, no parking, and construction detours will be posted along the construction route.

Montecito - east of the Santa Isabel Ln. and N. Jameson Ln. intersection
On HOLD
Work hours: Monday – Friday from 8 a.m. to 4 p.m.
Community impacts: A lane closure will be in effect along the eastbound lane of N. Jameson Ln. during the project's work hours.

Irvine - along railroad tracks adjacent to Marine Way and Barranca Parkway in the city of Irvine.
Pipeline Replacement 9/5/2022 – 11/2022
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: There are no traffic impacts.

Anaheim and Yorba Linda - along Esperanza road near the Imperial Highway overpass.
Valve Replacements 9/26/2022 – 11/2022
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: Traffic control will be set up along Esperanza Road during work hours

Yorba Linda - work will take place at the Yorba Linda Station along Esperanza Rd.
10/10/2022 – 11/2022
Work hours: Monday – Friday from 7 a.m. to 5 p.m.
Community impacts: There will be construction noise from the use of a drilling rig and other heavy machinery. There are no traffic impacts.

Yorba Linda - at the corner of Valley View Cir and Lavender Dr.
9/19/2022 – 1/2023
Work hours: Monday – Thursday from 7 a.m. to 5 p.m.
Community impacts: Traffic control will be set up at the intersection of Valley View Cir and Lavender Dr.

Morro Bay - on private property near HWY 41 in the City of Morro Bay
Pipeline Testing 9/2022 – 11/2022
Work hours: Monday – Friday from 6:30 a.m. to 6 p.m.
Community impacts: There are no traffic impacts.

Cathedral City - Date Palm Dr.
Validation Dig 9/12/2022 – 10/2022
Work hours: Monday – Friday from 6 a.m. to 5 p.m.
Community impacts: Traffic control will be required along Date Palm Dr

Laguna Niguel - along Aloma Ave between Calle Juca and the east end of Aloma Ave.
Main and Service Line Replacement 8/1/2022 – 11/2022
Work hours: Monday – Friday from 8 a.m. to 4 p.m.
Community impacts: No parking and lane reductions will be in effect on Aloma Ave.

Lancaster - along Division S between East Ave K and East Ave K4. 
Three Validation Digs 8/22/2022 - 9/2022
Work hours: Monday – Friday 6:30 a.m. to 5 p.m. 
Community impacts: Traffic will be reduced to one lane at construction site.

Porter Ranch - on Wilbur Ave just south of Chatsworth St
Vault and gearbox replacement 8/15/2022 – 9/2022
Work hours:  Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: Northbound traffic on Wilbur Ave will be reduced to one lane near the construction site.

Buena Park – along La Palma Ave between Valley View and Knott Ave.
Validation Dig - on Limonite Ave 8/1/2022 – 10/2022
Work hours: Monday – Friday from 9 a.m. to 3 p.m.
Community impacts: Both westbound and eastbound lanes La Palma Rd will be reduced to one lane.

Ventura – on private property near the intersection of N. Olive St and W. McFarlane Dr.
Pipeline Testing 10/31/2022 – 11/2022
Work hours: Monday to Friday from 7 a.m. to 5 p.m.
Community impacts: Residents and businesses in the area may see additional truck traffic, a flat-bed truck, a large crane, and personnel on-site during this scheduled work period. All company vehicles will be parked within our property. Public parking will remain open for all residents and businesses. Those in the immediate area may hear some construction noise from the equipment and crews during work hours.

Ventura County / Carpentaria – near Taylor Ranch Rd. in Ventura County and continue west towards Casitas Pass Rd. in Carpinteria.
Pipeline Testing 10/10/2022 – 11/2022
Work hours: Monday to Thursday, 6 a.m. to 5 p.m.
Community impacts: Traffic control signage, flag personnel, no parking signage, lane closures, and detours will be posted along the construction route, if needed.

Sullivan Canyon – in Los Angeles County in the Sullivan Canyon area.
Validation Dig - 11/1/2022 – 3/2023
Work hours: Monday – Friday from 7 a.m. to 4 p.m.
Community impacts: There are no traffic impacts.

Simi Valley - Royal Ave and Darrah Ave.
Pipeline replacements, Hydrotest 8/15/2022 – 11/2022
Work hours: Monday – Friday from 9 a.m. to 3 p.m.
Community impacts: Lane closure will be in effect along westbound lanes of Royal Ave. Traffic control signage, lane closures and flag personnel and no parking signage will be posted.