Adelanto
- Grading work: 5/5/2025 – 6/5/2025
- Work Hours: Monday – Friday from 6:00 am to 4:30 pm
- Community Impacts: None. This work will take place on private property off the main roads. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Avenal
Near Skyline Rd
- Inspection and Remediation Work: 4/7/2025 – 5/26/2025
- Work Hours: Monday – Thursday from 6:00 am to 4:00 pm
- Community Impacts: None. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Cabazon
On Elm St
- Valve and Facility Upgrades: 4/72025 – 7/7/2025
- Work Hours: Monday – Friday from 7:00 am to 5:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas contractors.
Carson
North of the Intersection of E Victoria St and S. Central Ave
- Regulator Station Upgrade: 3/10/2025 – 5/10/2025
- Work Hours: Monday – Friday from 7:00 am to 5:00 pm
- Community Impacts: None
Chino Hills
On Clubhouse Way
- Validation Dig: 5/5/2025 – 6/16/2025
- Work Hours: Monday – Friday from 7:00 am to 5:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, and detours will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
City of Industry and Inglewood
At Puente Station in City of Industry and Crenshaw Station in Inglewood
- In-line Inspection Equipment Setup: 4/14/2025 - 8/14/2025
- Work Hours: Monday - Friday from 9:00 am to 3:30 pm (City of Industry); Monday - Friday from 8:00 am to 5:00 pm (Inglewood)
- Community Impacts: Traffic control signage, flag personnel, lane closures, and potential detours will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Colton
At the Colton Chevron
- Natural Gas Vehicle Station Addition: 4/7/2025 – 6/7/2025
- Work Hours: Monday – Friday from 7:00 am to 3:30 pm
- Community Impacts: No parking and partial lane closure of the eastbound lane of E H St between N 10th St and N Mt. Vernon Ave. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Culver City
Northwest of intersection of W Centinela Ave and Arizona Ave
- Validation Digs: 4/1/2025 – 7/1/2025
- Work Hours: Monday – Friday from 8:00 am to 6:00 pm
- Community Impacts: None.
Delano/Visalia
Delano Junction and Visalia Station
- In-line Inspection: 3/31/2025 – 6/23/2025
- Work Hours: Monday – Saturday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Diamond Bar
Various streets within Allegro Condo Comm
- Main and Service Line Replacements: 1/6/2025 – 5/6/2025
- Work Hours: Monday – Friday from 8:00 am to 4:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, and potential detours will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
El Monte
On Elliott Ave
- Installation of Filter Seperator: 5/19/2025 – 6/23/2025
- Work Hours: Monday – Friday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Fontana/Yorba Linda
Duncan Canyon Rd in Fontana/Esperanza Rd in Yorba Linda
- In-line Inspection: 3/31/2025 – 5/31/2025
- Work Hours: Monday - Friday from 8:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Glendora
- Main and Service Line Replacements: 5/12/2025 – 8/12/2025
- Work Hours: Monday - Friday from 7:00 am to 4:30 pm
- Community Impacts: None. Occasional narrowing of traffic lanes near Tedrow Ave and Calmgrove Ave. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Granada Hills
Near the intersection of Balboa Blvd and Lisette St
- SCCDA Digs: 4/14/25 - 6/16/2025
- Work Hours: Monday - Friday from 8:00 am to 4:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. The northbound bike lane on Balboa Blvd will be closed for approximately 250 feet around the construction area. The southbound two left lanes on Balboa Blvd will be closed for approximately 250 feet around the construction area. The northbound far-right lane on Balboa Blvd will be closed for approximately 250 feet around the construction area.
Handford
Multiple locations on Lacey Blvd
- Hydrotest: 4/28/2025 - 9/8/2025
- Work Hours: Monday - Thursday from 6:00 am to 5:30 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. Temporary crash cushion (19-barrel array system) with temporary railing located on the south-west corner on intersection of Lacey Blvd. and 7th Ave, East of the offramp from Hwy 198. Temporary crash cushion (19-barrel array system) with temporary railing located on south shoulder of Lacey Blvd heading East. Temporary crash cushion (19-barrel array system) with temporary railing located on southeast corner on intersection of Lacey Blvd. and 6th Ave.
Irvine
Between Marine Way and Barranca Pkwy
- Pipeline Relocation: 4/14/2025 - 8/14/2025
- Work Hours: Monday - Thursday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. No traffic impacts are anticipated.
Kern County
Wheeler Ridge Compressor Station to Edmonston Plant
- In-line Inspection: 5/5/2025 - 6/30/2025
- Work Hours: Monday - Saturday from 6:00 am to 6:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Los Angeles
Along Normandie Ave between W. 190th St. and 186th St
- New Main Installation: 3/17/2025 - 5/17/2025
- Work Hours: Monday - Thursday from 8:00 am to 5:00 pm; Friday - Saturday from 8:00 am to 6:00 pm
- Community Impacts: A lane closure will occur along the southbound lanes of Normandie Ave. Traffic control signage, flagging personnel, no parking signage, lane closures, and detours will be posted along the construction route.
Along Sepulveda Blvd near the intersection of Sepulveda Blvd and Valley Meadow Blvd
- ECDA Indirect Assessment: 4/21/2025 - 8/11/2025
- Work Hours: Monday - Friday from 8:00 am to 4:00 pm
- Community Impacts: Traffic control signage, flagging personnel, no parking signage, and detours will be postponed along the construction route.
Ludlow/Newberry
From Ludlow to Newberry
- Hydrotest: 5/27/2025 - 12/27/2025
- Work Hours: Monday - Saturday from 6:00 am to 6:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas contractors.
Menifee
On Briggs Rd and Holland Rd
- Drop Section: 4/7/2025 - 9/7/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Maricopa
- Leak Repair: 5/19/2025 - 8/11/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. Single lane on Klipstein Canyon Road will be closed off 5/05/2025 to 08/05/2025. A section of Klipstein Canyon Rd will be closed off and not allow thru traffic on 6/04/25 - 6/06/2025 beginning at 6am for 24-48 hours. Traffic control will be used for the duration of the project.
Morongo Reservation
On Service Rd and Millard Pass Rd
- Validation Digs: 5/12/2025 - 6/23/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, and detours will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Needles
At and around the South Needles Compressor Station
- Remediation Digs: 4/28/2025 - 10/28/2025
- Work Hours: Monday - Friday from 6:00 am to 4:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Newport Beach
In the 2 alleys between I St and L St, south of Balboa Blvd and north of Miramar Dr
- New Main Installation: 3/31/2025 - 6/31/2025
- Work Hours: Monday - Friday from 7:00 am to 3:00 pm
- Community Impacts: Traffic control will be in effect for duration of the project. Alleyway access will be limited during work hours. Residents will see trucks and heavy equipment from SoCalGas and our contractors.
Oxnard
Intersection of Rice Ave and E. 5th St
- Robo In-line Inspection/Direct Examination: 1/13/2025 - 6/13/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Traffic control signage, flagging personnel, no parking signage, lane closures, and detours will be posted along the construction route.
Pico Rivera
SoCalGas Pico Rivera Base at 8101 Rosemead Blvd
- Living Lab Construction: 3/3/2025 - 5/12/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Rancho Cucamonga
Etiwanda Station
- Robo In-line Inspection: 4/21/2025 - 7/21/2025
- Work Hours: Monday - Thursday from 6:00 am to 5:00 pm
- Community Impacts: Partial lane closures of westbound lanes of Arrow Rte. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Rancho Mission Viejo
Along Antonio Parkway, adjacent to Orange County Fire Station #56
- Regulator Station upgrade: 5/19/2025 - 6/19/2025
- Work Hours: Monday - Thursday from 9:00 am to 3:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. Traffic control will be in effect intermittently.
San Bernardino
Intersection of E 3rd St and N Tippecanoe Ave
- New Regulator Station Installation: 2/24/2025 - 5/26/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Closure of two eastbound lanes on E 3rd St. One lane closed in each direction of N Tippecanoe Ave. Traffic will be taken down daily. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Santa Ana
Along Red Hill Ave, south of Dyer Rd
- CCM Work: 4/21/2025 - 6/21/2025
- Work Hours: Monday - Thursday from 8:00 pm to 6:00 am
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors. Traffic control will be in effect for the duration of the project.
Along Grand Ave, between Dyer Rd
- Validation Digs: 5/1/2025 - 7/1/2025
- Work Hours: Monday - Friday from 7:00 pm to 7:00 am
- Community Impacts: Traffic control will be in effect along Grand Ave area during work hours. Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Santa Barbara
Near the intersection of Stanwood Dr and Mission Ridge Rd
- Deep Well Anode Installation: 3/10/2025 - 5/12/2025
- Work Hours: Monday - Friday from 7:00 am to 5:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Santa Clarita
Near Shannondale Rd and Shannon Valley Rd (Dig 1), Dusty Rd and Sierra Hwy (Dig 2), and near the Santa Clara River and 14 Freeway (Dig 3)
- Validation Digs: 2/24/2025 - 5/24/2025
- Work Hours: Monday - Friday from 6:00 am to 4:00 pm
- Community Impacts: Customers will see trucks and heavy equipment from SoCalGas and our contractors.
Santa Clarita/Los Angeles/Encino
NW of intersection of Golden Valley Rd and Robert C. Lee Pkwy (Santa Clarita), near the intersection of Inglewood Blvd and Jefferson Blvd (Los Angeles), near the intersection of Killion St and Yarmouth Ave (Encino)
- In-line Inspection: 2/24/2025 - 5/24/2025
- Work Hours: Monday - Friday from 6:30 am to 5:00 pm
- Community Impacts: Traffic control signage, flagging personnel, no parking signage, and detours will be postponed along the construction route at the different location.
Santa Maria
West of intersection of Betteravia Rd and S Deport St
- Direct Examination: 4/14/2025 - 5/26/2025
- Work Hours: Monday - Friday (potentially Saturday) from 6:00 am to 5:00 pm
- Community Impacts: A single-lane closure will be in effect along the westbound lanes of Betteravia Rd. Traffic control signage, flagging personnel, no-parking signage, lane closures, and detours will be posted along the construction route.
Near intersection of W Battles Rd and S Depot St
- Valve Upgrade: 5/5/2025 - 6/2/2025
- Work Hours: Monday - Friday from 6:30 am to 5:00 pm
- Community Impacts: Traffic control signage, flag personnel, lane closures, will be posted along the construction routes. Customers will see trucks and heavy equipment from SoCalGas contractors.
Ventura
Near the intersection of N Olive St and W McFarlane Dr
- In-line Inspection: 1/6/2025 -5/6/2025
- Work Hours: Monday - Friday from 7:00 am to 4:30 pm
- Community Impacts: Residents and businesses in the area may see additional truck traffic, and personnel on-site during this scheduled work period. Public parking will remain available for all residents and businesses. Those in the immediate area may hear construction noise from the equipment and crews during work hours.
West of HWY 101 and HWY 1 off-ramp
- Valve Repair: 5/19/2025 -7/28/2025
- Work Hours: Monday - Friday from 6:30 am to 5:00 pm
- Community Impacts: None