Skip to main content

A.23-08-019 – Application of Southern California Gas Company for Authority To Recover Ventura Compressor Modernization Project Revenue Requirement in Customer Rates and for Approval of Related Cost Allocation and Rate Design Proposals

default blue hero image
Submitted by EMendoz1 on Sat, 07/13/2024 - 14:56

Notice of Availability

  • Notice of Availability

Application - Certificate of Public Convenience and Necessity (CPCN)

  • Certificate of Public Convenience and Necessity (CPCN) Application

Proponents Environmental Assessment (PEA)

  • Proponents Environmental Assessment (PEA)

PEA Appendices

  • Appendix A Detailed Maps and Design Drawings 
  • Appendix B Air Quality and GHG Emissions Technical Report
  • Appendix C Biological Resources Assessment
  • Appendix D Cultural Resources Inventory Report
  • Appendix E Tribal Consultation Report
  • Appendix F Phase I Environmental Site Assessment
  • Appendix G Agency Consultation and Public Outreach Report and Records of Correspondence
  • Appendix H Preliminary Construction Fire Prevention Plan
  • Appendix I Report of Geotechnical Investigation
  • Appendix J Paleontological Resources Inventory Report
  • Appendix K Hazardous Materials Business Plan/Integrated Storm Water and Oil Spill Prevention, Control, and Countermeasure Plan
  • Appendix L Hydrology Drainage Study
  • Appendix M Noise Modeling Data
  • Appendix N Flow Data Confidential
  • Appendix O Preliminary Health and Safety Plan
  • Appendix P Technical Design Standards and Codes
  • Appendix Q Pipeline Repair

PEA Attachments

Attachment 1 References Cited

  • Section 1 Executive Summary
  • Section 2 Introduction
  • Section 3 Project Description
  • Section 4 Description of Alternatives
  • Section 5 Environmental Analysis
  • Section 5.1 Environmental Analysis - Aesthetics
  • Section 5.2 Environmental Analysis - Agriculture and Forestry
  • Section 5.3 Environmental Analysis - Air Quality
  • Section 5.4 Environmental Analysis - Biological
  • Section 5.5 Environmental Analysis - Cultural Resources
  • Section 5.6 Environmental Analysis - Energy
  • Section 5.7 Environmental Analysis - Geology and Soils
  • Section 5.8 Environmental Analysis - Green House Gases
  • Section 5.9 Environmental Analysis - Hazards and Hazardous Materials
  • Section 5.10 Environmental Analysis - Hydrology and Water Quality
  • Section 5.11 Environmental Analysis - Land Use and Planning
  • Section 5.12 Environmental Analysis - Mineral Resources
  • Section 5.13 Environmental Analysis - Noise
  • Section 5.14 Environmental Analysis - Population and Housing
  • Section 5.15 Environmental Analysis - Public Services
  • Section 5.16 Environmental Analysis - Recreation
  • Section 5.17 Environmental Analysis - Transportation
  • Section 5.18 Environmental Analysis - Tribal and Cultural Resources
  • Section 5.19 Environmental Analysis - Utilities
  • Section 5.20 Environmental Analysis - Wildfire
  • Section 5.21 Environmental Analysis - Mandatory Finding of Significance
  • Section 6 Comparison of Alternatives
  • Section 7 Cumulative
  • Attachment 2 GIS Native Files (available upon request)

  • Attachment 3 Air Modeling Native Files (available upon request)

  • Attachment 4 Mailing List Excel File (available upon request)

Response to PEA Completeness Review Round 1

  • Response to PEA Completeness Review Cover Letter
  • Response to PEA Completeness Review
  • Revised Appendices
    • Appendix A Detailed Maps and Design Drawings revised Nov 2023
    • Appendix B Air Quality and GHG Emissions Technical Report revised Nov 2023
    • Appendix C Biological Resources Assessment revised Nov 2023 
    • Appendix H Preliminary Construction Fire Prevention Plan revised Nov 2023 
    • Appendix O Preliminary Emergency Action and Fire Prevention Plan and Preliminary Health and Safety Plan revised Nov 2023 
    • Confidential Appendix Q Pipeline Repair/Replacement and Inspection revised Nov 2023
    • Appendix R Preliminary Traffic Plan and Control Nov revised 2023 
    • Public PEA Appendix S_Risk Assessment April 2024
  • Revised Attachments
    • Attachment 1 References Cited (files available upon request)
    • Attachment 2 AQ Modeling Files (native files available upon request)
    • Attachment 3 GIS Data (native files available upon request)
    • Attachment 5 VMT Calculations (native file available upon request)

Response to PEA Completeness Review Round 2

  • Response to PEA Completeness Review Cover Letter July
  • Response to PEA Completeness Review July
  • Response to PEA Completeness Review Cover Letter October
  • VCM Fugitives Venting Analysis - October 2024
  • Revised Appendix:
    • Public PEA Appendix S_Risk Assessment July 2024

Testimony

  • Prepared Direct Testimony of Julia Leigh Cortez (Rates Testimony)
  • Prepared Direct Testimony of Rae Marie Q. Yu (Regulatory Accounts Testimony)
  • Prepared Direct Testimony of Sakif Wasif (Revenue Requirements Testimony)

Project Notice

  • Project Notice English
  • Project Notice Spanish

Workpapers

Data Requests

CAUSE_SCG_01

  • VCM_A2308019_CAUSE_SCG_01
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_01_GS182.0032
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_02_GS182.0032PubHistory
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_03_GS223.0155
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_04_GS223.0155PubHistory
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_05_GS223.0240
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_06_GS223.0240PubHistory
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_07_GS223.0255
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_08_GS223.0255PubHistory
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_09_Form3466
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_10_Form3466PubHistory
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_11_ Form7011
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_12_ Form7011PubHistory 
    • VCM_A2308019_CAUSE_SCG_01_Q04_Attach 01.xls (native file available upon request)
    • VCM_A2308019_CAUSE_SCG_01_Q09 Attach 01_KettlemanDeliveries
    • VCM_A2308019_CAUSE_SCG_01_Q09 Attach 02_Correspondence_Redacted
    • VCM_A2308019_CAUSE_SCG_01_Q09 Attach_03_MasterExchangeAgmt
  • Supplement
    • VCM_A2308019_DR_CAUSE_SCG_01_ Q1_bc_Supplemental_100623 
    • VCM_A2308019_CAUSE_SCG_01_Q01_Attach_13_Ventura Blowdowns_2015_2023
  • Supplement 2:
    • VCM_A2308019_DR_CAUSE_SCG_01_Q2_Q9_Supplemental_110823

CAUSE_SCG_02

  • VCM_A2308019_DR_CAUSE_SCG_02
    • VCM_A2308019_CAUSE_SCG_02_Q10_Attach_01_ DevilsCanyonRoadCorrespondence
    • VCM_A2308019_CAUSE_SCG_02_Q11 Attachments (native files available upon request)
    • VCM_A2308019_CAUSE_SCG_02_Q12_Attach_01_ StaticPac
    • VCM_A2308019_CAUSE_SCG_03_Q13_Attach_01_VenturaBlowdowns

CAUSE_SCG_03

  • VCM_A2308019_CAUSE_SCG_03
    • VCM_A2308019_CAUSESCG_03_Q01_Attach_01_Plot_Space_Gas_Turbine_Generator_Package
    • VCM_A2308019_CAUSE_SCG_03_Q01_Attach_02_ Plot_Space_SCE_Substation_2_66_KV_Lines
    • VCM_A2308019_CAUSE_SCG_03_Q01_Attach_03_ Load List_10MW

CAUSE_SCG_04 Confidential

CalPA_SCG_01

  • VCM A2308019 DR CalPA-SCG-01_Redacted
  • Attachment:
    • VCM_A2308019_CalPA_SCG_01_Q03_Attach_01_ VCS_MeterData (native file available upon request)

CAUSE_SCG_05

  • VCM_2308019_DR_CAUSE_SCG_05
  • Attachment:
    • VCM_A2308019_CAUSE_SCG_05_Q02_Attach_01_ Proposed Project_LoadList

CityofVentura_SCG_01

  • VCM_2308019_DR_CoV_SCG_01
  • Attachments:
    • VCM_A2308019_CoV_SCG_01_Q06_Attach_01_Correspondence_Redacted 
    • VCM_A2308019_CoV_SCG_01_Q0_Attach_02_MasterExchangeAgmt 
    • VCM_A2308019_CoV_SCG_01_Q14_Attach_01_DevilsCanyonRoadCorrespondence 
    • VCM_A2308019_CoV_SCG_01_Q15_Attach_01_CityCorrespondence 
    • VCM_A2308019_CoV_SCG_01_Q16_Attach01_SED_DR1_08192021
    • VCM_A2308019_CoV_SCG_01_Q17_Attach01_A1411004_ORA_SCG_DR092
    • VCM_A2308019_CoV_SCG_01_Q17_Attach02_A1411004_SCGC_DR03
    • VCM_A2308019_CoV_SCG_01_Q17_Attach03_A1710008_TURN_DR051
    • VCM_A2308019_CoV_SCG_01_Q17_Attach04_A2205015_SCGC_SCG_DR002Q910
    • VCM_A2308019_CoV_SCG_01_Q17_Attach05_A2205015_CEJA_SCG_003
    • VCM_A2308019_CoV_SCG_01_Q17_Attach06_ A2205015_CEJA_SCG_06 
    • VCM_A2308019_CoV_SCG_01_Q17_Attach07_ A2205015_CEJA_SEU_001
    • VCM_A2308019_CoV_SCG_01_Q17_Attach08_ A2205015_PAO_SCG_052

CityofVentura_SCG_02

  • VCM_2308019_DR_CoV_SCG_02 
  • Attachments:
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_01_2021MayReport 
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_02_2021OctVirturalQandA
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_03_2021OctReport 
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_04_2022AprilReport 
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_05_2022AprilVirturalQandA
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_06_2023MarchComments
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_07_2023MarchVirturalQandA
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_08_2023MarchComments
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_09_ CanvassingLog
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_10_ AdPlacementsonSite
    • VCM_A2308019_CoV_SCG_02_Q21_Attach_11_CallAndEmailLog 
    • VCM_A2308019_CoV_SCG_02_Q29_Attach_01_NCostalProducers (native file available upon request)
    • VCM_A2308019_CoV_SCG_02_Q30_Attach_01_NcostalDemand
    • VCM_A2308019_CoV_SCG_02_Q35_Attach_01_1987GoletaDOGGRLtr
    • VCM_A2308019_CoV_SCG_02_Q45_Attach_01_2021FireCorr
    • VCM_A2308019_CoV_SCG_02_Q45_Attach_02_2022FireCorr
    • VCM_A2308019_CoV_SCG_02_Q45_Attach_03_2023SignInSheet
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_01_BackupPowerDocs
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_02_EleMotorAnalysis
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_03_IGPTechDesc
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_04_Spirit12Tech
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_05_GasTurbineGen
    • VCM_A2308019_CoV_SCG_02_Q57_Attach_06_20210825Email
    • VCM_A2308019_CoV_SCG_02_Q61_Attach_01_Estimates 
    • VCM_A2308019_CoV_SCG_02_Q61_Attach_02_ SuppDocsEst
    • VCM_A2308019_CoV_SCG_02_Q61_Attach_03_OpsCost
    • VCM_A2308019_CoV_SCG_02_Q61_Attach_04_ModelReview.nwd (native file available upon request)
    • VCM_A2308019_CoV_SCG_02_Q79_Attach_01_20230818
    • VCM_A2308019_CoV_SCG_02_Q79_Attach_02_20230824
    • VCM_A2308019_CoV_SCG_02_Q79_Attach_03_20230915
    • VCM_A2308019_CoV_SCG_02_Q79_Attach_04_20231130
    • VCM_A2308019_CoV_SCG_02_Q79_Attach_05_20231218
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_01_20221024LtrReqExt
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_02_20221108LtrGrantExt
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_03_20221123LtrReqGuidance
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_04_20221205LtrGrantingExt
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_05_20230306EmailProjDesc
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_06_20230307EmailProjDesc
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_07_20230317Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_08_20230324Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_09_20230330Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_10_20230331LtrReqExt 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_11_20230407LtrGrantExt
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_12_20230427Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_13_20230503Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_14_20230509EmailMOU 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_15_20230522LetterPFDeposit
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_16_20230523EmailFedEx 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_17_20230524DraftPEA (large file available upon request)
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_18_20230524Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_19_20230602Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_20_20230606Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_21_20230615Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_22_20230623EmailPFPEA
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_23_20230822EmailPayment
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_24_20230824LetterFee 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_25_20230905EmailPEAAttach
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_26_20230906Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_27_20230908Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_28_20230915Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_29_20230922Invoice 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_30_20231005EmailStateClear
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_31_20231024Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_32_20231113EmailMtg 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_33_20231117Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_34_20231120Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_35_20231123EmaiRespPEARev
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_36_20231201Invoice 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_37_20231226Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_38_20231226Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_39_20240102Invoice
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_40_20240104Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_41_20240108Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_42_20240108Email
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_43_20240117ExParteMtg
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_44_20240122Invoice 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_45_20240125Email 
    • VCM_A2308019_CoV_SCG_02_Q80_Attach_46_202401236Email 

CalPA_SCG_02

  • VCM_A2308019_ DR_CalPA_SCG_02 
  • Attachments
    • VCM_A2308019_CalPA_SCG_02_Q01_Attach_01_ GoletaInjCap (native file available upon request)
    • VCM_A2308019_CalPA_SCG_02_Q03_Attach_01_ GoletaInventory (native file available upon request)
    • VCM_A2308019_CalPA_SCG_02_Q04_Attach_01_ VCS_OOS_Data (native file available upon request)
    • Confidential_VCM_A2308019_CalPA_SCG_02_Q09_Attach_01_ AppFig11Data (native file available upon request)

Cause_SCG_06

  • PUBLIC VCM 2308019 CAUSE-SCG-06_Redacted 

CalPA_SCG_03

  • Public VCM 2308019 CalPA_SCG_03 Revision 01
  • Attachments
    • Public_VCM_A2308019_CalPA_SCG_03_Q07_Attach_01_FlowMatrixSummary
    • Public_VCM_A2308019_CalPA_SCG_03_Q07_Attach_02_NEADatasheets

CalPA_SCG_04

  • VCM 2308019 DR Response CalPA SCG 04
  • Attachments
    • Public VCM A.23-08-019 Ventura CPCN SCG 04-03_DDS.pdf
    • Confidential VCM A.23-08-019 Ventura CPCN SCG 04-04.xlsx
    • Confidential VCM A.23-08-019 Ventura CPCN SCG 04-05.xlsx
    • VCM_A2308019_CalPA_SCG_04_Q06_Attach_01_ VCS ATC application 3-27-2020
    • Public PEA Appendix S_Risk Assessment April 2024

CalPA_SCG_05

  • Public VCM 2308019 DR Response CalPA SCG 05 Revision 01

CAUSE_SCG_07

  • VCM 2308019 CAUSE-SCG-07
SoCalGas - Glad to be of service

Our mission: Safe, Reliable, and Affordable energy delivery today. Ready for tomorrow.

Connect with us:

Services

  • Residential Services
  • Business Services
  • Start Service
  • Stop Service
  • Transfer Service

Billing

  • Ways to Pay
  • Assistance Programs
  • Manage Higher Bills
  • Understanding My Bill
  • Business Billing

Savings

  • Rebates and Incentives
  • Energy Saving Tips & Tools
  • Business Savings
  • Business Rebates and Incentives

Safety

  • Emergency Resources
  • Safety & Prevention
  • Safety Resources
  • Methane Emissions
  • Safe Access

About Us

  • Our Mission
  • Careers
  • Newsroom
  • Contact Us
  • Sitemap
  • Rates & Regulatory
  • Accessibility Center
  • Privacy Center
  • Unclaimed Property
  • Terms & Conditions
  • Energy Usage Request
  • Help Center

Southern California Gas Company is a subsidiary of Sempra®. © 1998 - Southern California Gas Company. SoCalGas® is a registered trademark of Southern California Gas Company. The trademarks used herein are the property of their respective owners. All rights reserved.