Application
Testimony
- Testimony Chapter 1 - Policy (M. Brown)
- Testimony Chapter 2 - Angeles Link and Summary of Phase 1 Studies (N. Navin)
- Testimony Chapter 3 - Project Development and Programmatic Activities (A. Kitson)
- Testimony Chapter 4 - Engineering Design (B. Walker)
- Testimony Chapter 5 - Value of Electric Grid Reliability and Resilience (J. Schellenberg)
- Testimony Chapter 6 - Air Quality and Public Health Benefits (S. Sax)
- Testimony Chapter 7 - Regulatory Accounting, Cost Recovery, Revenue Requirement, And Rates (N. Ahmed, M. Foster)
- Testimony Chapter 8 - Affordability Metrics (M. Foster)
Workpapers
- PUBLIC Workpaper Chapter 3 - Project Development and Programmatic Activities (A. Kitson)
- PUBLIC Workpaper Chapter 4 - Engineering Design (B. Walker)
- Workpaper Chapter 7 - Regulatory Accounting, Cost Recovery, Revenue Requirement, And Rates (N. Ahmed, M. Foster)
Discovery
- Communities for a Better Environment (CBE)
- CBE-01
- California Public Advocates Office (CalPA)
- CalPA-01
- CalPA-02
- Cal-PA-03
- The Utility Reform Network (TURN)
- TURN-01
- ALP2 A2412011 DR TURN SCG 01
- ALP2 A2412011 DR TURN 01 Q4 Attach 01 Chap 7 Sec III Table Excel (excel file available upon request)
- ALP2 A2412011 DR TURN 01 Q4 Attach 02 Chap7 Table 4 Excel (excel file available upon request)
- TURN-01